

Founded: 1961 Total Students: 30,000+
Overview
Florida Atlantic University, established in 1961, officially opened its doors in 1964 as the fifth public university in Florida. Today, the University serves more than 30,000 undergraduate and graduate students across six campuses located along the southeast Florida coast and is ranked as a top public university by U.S. News and World Report.
FAU is an energetic and fast-growing institution, determined to propel itself to the forefront of innovation and scholarship. In recent years, the University has doubled its research expenditures and outpaced its peers in student achievement rates. Our students are bold, ambitious and ready to take on the world.
Florida Atlantic University - Boca Raton Campus
More than 70 percent of FAU's 29,000 students take classes at FAU's first and largest campus, and the majority of the University's 170+ degree programs are based here. Located less than three miles from the Atlantic Ocean and the beautiful beaches of Boca Raton, the campus features everything you would expect from a modern university – suite-style housing for more than 4,500 students, brand-new athletics and recreational facilities, art galleries, a cafe/movie theater complex and so much more — all in a vibrant, tropical setting with a student body that is the most diverse among Florida's public universities.
Programs Offered in Study Group - Florida Atlantic University - Boca Raton Campus
Students Life
TOTAL STUDENTS
Cost Per Year*
AVERAGE COST OF LIVING
Average Tuition Fee Per Year*
UNDERGRADUATE
GRADUATE
*Note: The fee is approximate and is subject to change
English Score Requirement
MINIMUM IELTS SCORE
UNDERGRADUATE
GRADUATE
MINIMUM TOEFL IBT
UNDERGRADUATE
GRADUATE
Note: Language proficiency requirements can vary on program basis.
Admission Requirements
The following requirements must be fulfilled to get admitted to Florida Atlantic University
- International students are considered on a case-by-case basis. There can be some additional requirements, depending on the program you are applying to.
- Students are required to submit their original transcripts from their last attended academic institutions. If they are not in English, then submit the translated copies of the same along with the originals.
- Financial support statement (original bank statement and sponsor letter).
- Passport identification page with machine-readable code visible
- Applicants must be 18 years old at the time of the beginning of the course.
- You need to submit your English language proficiency test scores if you are coming from a non-English speaking country.
Opportunities
Accomodation
Scholarships
University | Level | Program | Initial Scholarship Amount | Years 2-4 Scholarship | Provider | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Florida Atlantic University | Undergraduate | Direct Admit – Rest of World (non-India) | $500 | N/A | Study Group | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Direct Admit | Up to $6,000 | Up to $6,000 | Florida Atlantic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Direct Admit | President’s International Scholarship: $6,000 Eligibility requirements include: 3.5 GPA or higher on a 4.0 U.S. grading scale, SAT, ACT or CLT scores, and proof of English proficiency. Scholarships are competitive and awarded based on merit. No additional scholarship application is required. Students must submit a complete admissions application by these deadlines: Fall: January 15 (priority); March 15 (regular) Spring: August 15 (priority); October 15 (regular) |
$6,000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Summer/Fall Direct Admit – Latin American / Caribbean Students | Latin American & Caribbean Scholarship: In-state tuition and $500 per semester scholarship through Wilkes Honors College; Dorothy F. Schmidt College of Arts and Letters; College of Engineering and Computer Science; Center for Global Engagement. Scholarships are competitive, and all eligible candidates are automatically considered upon admission to the University. Students must be on an F-1 student visa and have at least a 3.0 admissions GPA. No additional scholarship application required. Students must submit a complete admissions application by these deadlines: Fall: January 15 (priority); March 15 (regular) Spring: August 15 (priority); October 15 (regular) |
In-state tuition and $500 per semester | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Graduate | Direct Admit – Rest of World (non-India) | $500 | N/A | Study Group |
Features of Study Group - Florida Atlantic University - Boca Raton Campus
Search Filters:
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, May 2025 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, May 2025 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, May 2025 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, May 2025 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
May 2024
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, May 2025 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2025 ,Aug 2024, Aug 2025
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025, Aug 2024,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 15 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
Jan 2025
May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
Jan 2025
May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
Jan 2025
May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024, Aug 2024, Jan 2025, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, May 2025 ,Aug 2024,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
Jan 2025, May 2024, Aug 2024, May 2025,
CAD 30.00 FREE
Living Cost: CAD 0.00/year
Program Length: 12 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
Jan 2025
May 2024, Aug 2024,
CAD 30.00
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, Aug 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2025, May 2024, Aug 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 5 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2025
May 2024, Aug 2024, Jan 2025, May 2025,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Campus Detail
Main Campus Address
777 Glades Road Boca Raton, FL 33431