Founded: 1982 Total Students: 33,000+
Int. Students: 3,800+
Overview
UIC was formed in 1982 by the consolidation of two U. of I. campuses: the Medical Center campus, which dates back to the 19th century and the comprehensive Chicago Circle campus which replaced, in 1965, the two-year undergraduate Navy Pier campus that opened in 1946 to educate returning veterans.
In the 20th century, new campuses were built in Chicago and later joined together to form a comprehensive learning community. In the last three decades, UIC has transformed itself into one of the top 65 research universities in the United States.
Programs Offered in Shorelight Group - University of Illinois at Chicago
Highlights
- 86 bachelor’s programs to explore your interests and find the right program.
- A low student-to-teacher ratio with 1 faculty member to every 18 students.
- Top-tier faculty and dedicated staff to help you prepare for a fulfilling career.
- 87 percent of full-time faculty hold a Ph.D. or equivalent degree, and 76 percent of tenured faculty teach undergraduate courses
- 1 in 3 students speak a language other than English at home
Students Life
TOTAL STUDENTS
Cost Per Year*
AVERAGE COST OF LIVING
Average Tuition Fee Per Year*
UNDERGRADUATE
GRADUATE
*Note: The fee is approximate and is subject to change
English Score Requirement
MINIMUM IELTS SCORE
UNDERGRADUATE
GRADUATE
MINIMUM TOEFL IBT
UNDERGRADUATE
GRADUATE
Note: Language proficiency requirements can vary on program basis.
Admission Requirements
The following requirements must be fulfilled to get admitted to University of Illinois at Chicago
- International students are considered on a case-by-case basis. There can be some additional requirements, depending on the program you are applying to.
- Students are required to submit their original transcripts from their last attended academic institutions. If they are not in English, then submit the translated copies of the same along with the originals.
- Financial support statement (original bank statement and sponsor letter).
- Passport identification page with machine-readable code visible
- Applicants must be 18 years old at the time of the beginning of the course.
- You need to submit your English language proficiency test scores if you are coming from a non-English speaking country.
Opportunities
Accomodation
On-Campus Housing
With a diverse student body and a wide variety of activities on campus, it’s easy to find a place to fit in and make memories that will last a lifetime. Whether you live on campus or commute, there’s a place for you here at University of Illinois Chicago
With housing options all over campus, students can experience all UIC and Chicago have to offer. Many undergraduates live on the east side of campus, in the Academic & Residential Complex, Commons North, Commons South, Commons West and Courtyard residence halls. Students who live here are minutes from lecture halls, Student Center East and the Student Recreation Center.
Off-Campus Housing
UIC sits among many culturally rich neighborhoods, such as Greektown, South Loop, West Loop, Pilsen, Little Italy and Chinatown. University Village is a recently revamped community that’s trendy, student-oriented and only a few blocks from campus. On the CTA bus and “L,” most neighborhoods are just a few minutes away from UIC.
Student Support
The University of Illinois at Chicago has carved a niche for itself owing to the exceptional student services made available to the students. There are a vast number of student services available at the University of Illinois at Chicago, which help the students both old and new in numerous different ways. The following are a few of them:
- Academic Center for Excellence
- Academic Coaching
- Asian American Resource and Cultural Center
- Gender and Sexuality Center
- Disability Resource Center
- Learning Resource Centers
- Math and Science Learning Center
- Office of International Services
- Tutoring Services
- UIC Bookstore - Medical Bookstore - Tech Center
- UIC Library
- Writing Center
- Health and wellness
- Counseling Center
- Wellness Center
- CampusCare
Scholarships
Shorelight Group - University of Illinois at Chicago
Scholarships available for Spring 2025 Intake.
1 Year Undergraduate scholarships
Up to $5,000 in Year 1 Only |
Please note:
1.Scholarships are not automated, the student/ counsellor should request a scholarship over email within 5 business days of deposit payment.
2.The above waivers and scholarships are only available until November 15th 2024.
3.If students are arriving before the move in date, they need to make their own accommodation arrangements.
4.We recommend your students to accept their Offer letters as early as possible and not wait until the last minute due to the anticipated backlog in visa appointment availability.
5.Students cannot enter the U.S. more than 30 days before their I-20 Program Start Date. They could be turned away at the border or future benefits may be denied.
6.Limited Merit scholarships are still available for high achieving students.
Features of Shorelight Group - University of Illinois at Chicago
Search Filters:
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, Aug 2024, May 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025, Aug 2024, May 2024, May 2025 ,Aug 2025
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD 0.00/year
Program Length: 24 Months
PG Work Permit
Campus Detail
Main Campus Address
1200 W Harrison St, Chicago, IL 60607, United States