Founded: 1885 Total Students: 53,500+
Int. Students: 9,000+
Overview
Arizona State University (ASU) was first founded by the Thirteenth Territorial Legislature in 1885 as Territorial Normal School to provide education in mechanical arts and agriculture. It was later renamed as Arizona State Teachers College and again as Arizona State College in 1945.Arizona State University (ASU) public higher education institution in the United States. ASU was founded in 1885. It has an urban campus located in Tempe.
Arizona State University is a new kind of university, dedicated to innovative ideas and academic excellence to help you get where you want to be in life. At ASU, you are joining a community of scholars from around the world.
- Courses are taught by a student-focused faculty that includes Nobel laureates, Pulitzer Prize winners and Fulbright Scholars.
- Knowledge delivery goes beyond traditional methods, putting students in the middle of active learning experiences.
- Many students have opportunities to work with professors as team members on significant research projects.
Programs Offered in Kaplan Group - Arizona State University - Tempe Campus
Highlights
- Top 10 US university chosen by international students (Institute of International Education 2019)
- #1 in the U.S. for innovation ASU ahead of Stanford and MIT -U.S. News & World Report: 5 years, 2016-2020
- #3 in the world for employer-student connections (QS Graduate Employability Rankings 2020)
- No. 1 in the U.S. and No. 9 in the world for global impact
- Top producing' university of elite scholars for 10 consecutive years
- A top public university
- Top 10 in the nation among universities granted U.S. patents
- #16 in the U.S. for undergraduate teaching
- #1 in the world: Thunderbird global management degree
- #3 graduate local government management program in the U.S
- #8 Top producer of Peace Corps volunteers
- launching pad for 144+ start-ups
- 400+ Research Opportunities
Students Life
TOTAL STUDENTS
Cost Per Year*
AVERAGE COST OF LIVING
Average Tuition Fee Per Year*
UNDERGRADUATE
GRADUATE
*Note: The fee is approximate and is subject to change
English Score Requirement
MINIMUM IELTS SCORE
UNDERGRADUATE
GRADUATE
MINIMUM TOEFL IBT
UNDERGRADUATE
GRADUATE
Note: Language proficiency requirements can vary on program basis.
Admission Requirements
The following requirements must be fulfilled to get admitted to Arizona State University
- International students are considered on a case-by-case basis. There can be some additional requirements, depending on the program you are applying to.
- Students are required to submit their original transcripts from their last attended academic institutions. If they are not in English, then submit the translated copies of the same along with the originals.
- Financial support statement (original bank statement and sponsor letter).
- Passport identification page with machine-readable code visible
- Applicants must be 18 years old at the time of the beginning of the course.
- You need to submit your English language proficiency test scores if you are coming from a non-English speaking country.
Opportunities
Career preparation
Career Management and Employer Engagement assists you with your career options and coaches you in the most effective job search skills, through a range of services, programs, courses, and resources:
- Behavioral and case interviewing skills training
- Career fair, interview, and information strategy and etiquette
- Career path research tools and exercises
- In-person and video mock interviews
- Intensive focus on relationship-building skills
- Personal branding skills and execution
- Self-marketing skills utilizing multiple marketing channels
- Strategic planning skills
- Workforce skills identification and development
Accomodation
On-Campus Housing
Enjoy the convenience and impressive amenities of ASU’s modern on-campus student accommodations. These active student communities provide a safe and secure home during your studies. ASU also has over 50 dining venues across its 5 campuses, offering meals from many different cuisines.
Features of ASU housing
- Guaranteed for all first-year undergraduate students.
- Close to classes, services and dining locations
- On-site staff available at all times
- Fully furnished rooms and community spaces
- Cost includes water, electricity, cable and internet
Off-Campus Housing:
Whether you're a first-year student transitioning out of the dorms, a faculty member looking for short-term housing, or an international student looking for a place near campus, the Arizona State University Off-Campus Housing resource is here to help all ASU students, faculty, and staff with their search for off-campus housing
Here, you will find information about the housing options available off-campus, get connected roommates, find and list subleases, and receive tips and resources for living off-campus. Browse our list of resources and click on the active housing list for the most complete list of off-campus housing near ASU.
Off-Campus Resources
Check out these helpful resources as you consider your move off-campus.
- Off-Campus Connection Partners
- First Steps
- Signing a Lease
- Moving In
- Roommate Relations
- Rental Issues
- At Lease End
Homestay: Homestays are an integral system of housing for students. Students have the opportunity to avail homestay facilities as per their discretion and choices. Homestay hosts include single people, young couples with children and pets, and older couples. All homestay accommodations have been inspected, and all adults in the home have completed a required criminal reference check.
Student Support
Arizona State University has carved a niche for itself owing to the exceptional student services made available to the students. There are a vast number of student services at Arizona State University, which help the students both old and new in numerous different ways. The following are a few of them:
- Career and Professional Development Services
- Changemaker Central
- Counseling Services
- Dean of Students
- Disability Resources
- Fraternity and Sorority Life
- Health Services
- International Student Engagement
- Off Campus Housing
- Student Advocacy and Assistance
- Student Organizations
- Student and Cultural Engagement
- Student Rights and Responsibilities
- Student Unions and Centers
- Students with Families
- Sun Devil Fitness
- TRIO Programs
- University Housing
Scholarships
New American University (NAmU) Scholarship
Guide to awards for admitted undergraduate first-year students who meet all criteria
Polytechnic campus, West Valley campus | minimum $10,000; maximum $20,000, renewable annually* |
Downtown Phoenix campus, Tempe campus |
minimum $7,000; maximum $16,000, renewable annually* |
High school GPA (on a scale of 4.00) | Awarded to students with GPA 3.01+ and a higher English level |
English language test score or test exemption | Awarded to students with above IELTS 6.5 | TOEFL 68 | DET 110 and a higher GPA |
Guide to awards for admitted undergraduate transfer students who meet all criteria
Polytechnic campus, West Valley campus | minimum $6,000; maximum $14,000, renewable annually up to 2 years* |
Downtown Phoenix campus, Tempe campus | minimum $3,000; maximum $10,000, renewable annually up to 2 years* |
High school GPA (on a scale of 4.00) | Awarded to students with GPA 3.00+ and above IELTS 6.5 | TOEFL 76 | DET 115 |
English language test score or test exemption | Awarded to students with above IELTS 6.0 | TOEFL 63 | DET 105 and GPA 3.50+ |
Conditionally admitted students receive any NAmU award on passing English Language Program Advanced 2 level with minimum 84% or B overall grade
Graduate merit-based scholarships
Academic college or program | Eligibility guide | Award deducted from tuition |
Ira A. Fulton Schools of Engineering | Awarded to students with GPA 3.50+ (or 88+/100) and above IELTS 7.0 | TOEFL 90 | DET 125 or English test exemption |
minimum $6,000; maximum $10,000 |
MS Computer Science |
minimum $6,000; maximum $8,000 |
|
W. P. Carey School of Business | Awarded to students with GPA 3.50+ | $2,500 |
Admitted students can apply for a 2-semester W. P. Carey award | average $3,000–$5,000 | |
Thunderbird School of Global Management |
Awarded to students with GPA 3.50+ | minimum $5,000; maximum $10,000 |
Students can additionally submit an MGM Thunderbird scholarship request form when they appy for admission |
average $21,000; maximum $30,000 | |
Sandra Day O’Connor College of Law | Admitted LLM students can apply after accepting their offer | average $5,000 |
All other colleges | Awarded to students with GPA 3.50+ and above IELTS 7.0 | TOEFL 90 | DET 125 or English test exemption |
$5,000 |
Graduate students who are admitted with deficiencies must meet the deficiencies in order to become eligible for a scholarship award.
ASU-USA Pathways admission and progression scholarships
Admitted students are guaranteed $8,500 awarded for the 3-semester program, or $3,600 for 1-semester. Earned Pathways students are eligible for the scholarship in their first full Pathways session after they gain full admission. On successful completion of ASU-USA Pathways, students with GPA 3.25+ are awarded an ASU bachelor’s program tuition scholarship of $5,000, renewable annually.*
Kaplan International award
Students who do not meet the criteria for an ASU scholarship may be eligible for a Kaplan-funded partial scholarship (average $2,000) if they are unconditionally admitted to a bachelor’s or master’s degree. For undergraduates, the Kaplan award is given each semester until completion of their first spring semester at ASU. After that, if the student has no NAmU scholarship, the Kaplan award will be renewed* by ASU for 6 or 7 additional semesters. For graduates, Kaplan-funded awards are not renewable.
Features of Kaplan Group - Arizona State University - Tempe Campus
Search Filters:
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2024,Aug 2024
Jan 2024, Jan 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2024
Jan 2024, Jan 2025 ,May 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 15 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 20 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Aug 2024
Jan 2024, Jan 2025 ,May 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2025
Jan 2024, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 21 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 39 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, Aug 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 18 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, May 2024 ,Aug 2024, Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Aug 2024, May 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Aug 2024, May 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Aug 2024, May 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 15 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Aug 2024, May 2024 ,Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025 ,May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
Jan 2024, Jan 2025 ,May 2024 ,Aug 2024
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 27 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 39 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 9 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, May 2024 ,Aug 2024, Jan 2025, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 12 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025,May 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 39 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024 ,Aug 2024, May 2025
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 39 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 36 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Aug 2024, May 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Aug 2024, May 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2024, May 2024, Aug 2024, Jan 2025,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 30 Days
Program Intake:
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2025, May 2025 ,Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 24 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
Aug 2025
Jan 2024, Jan 2025, May 2024, Aug 2024,
CAD 0.00 FREE
Living Cost: CAD /year
Program Length: 39 Months
PG Work Permit
Processing Time: 42 Days
Program Intake:
May 2025,Aug 2025
Jan 2025,
CAD 26.00
Living Cost: CAD /year
Program Length: 48 Months
PG Work Permit
Campus Detail
Main Campus Address
1151 S. Forest Avenue Tempe, AZ 85281